|
[Home] [Assembly Instructions] [Products] [Fiber Optics] [Connectors] [Contact Us]
|
|
|
SS1200-4-2 Assembly Instructions [1200 Series]3mm Tight Buffered Fiber Instructions (16 steps) Specifications: Type: ST*, Field Installable, ST*II Compatible Mode: Multimode Ferrule Material: Stainless Steel sleeve w/glass insert Curing Type: Anaerobic & Epoxy Curable To return to instructions after viewing a diagram, click the back button on your web browser.
Step 1 Slide tapered end of 3mm flame retardant boot onto 3mm cable approx. 6". Starting with the small side of the crimp ring, slide the crimp ring onto the 3mm Cable.
Step 2 Place 3mm jacketed cable over Template. Mark 1.505 dimension, as per template. Strip.
Step 3 Trim Kevlar whiskers approx. 1/2".
Step 4 Place .9mm buffered tube over template. mark .74" dimension, as per template. Strip buffer tube off in front of 3mm cable with No Nik stripper.
Step 5 Now the 3mm jacketed cable will appear as shown in diagram.
Step 6 This step is very important. Clean stripped fiber with isopropyl alcohol soaked lint free cloth or a dry lint free cloth. To clean fold cloth in half over fiber and gently squeeze on the fiber and pull it through the cloth. This will clean the fiber of debris. Set aside carefully.
Step 7 - Gluing the Fiber
(Anaerobic and Epoxy)
Epoxy Instructions
Step 8 Cleave fiber on two sides. Pull straight up. Carefully dispose of cleaved fiber.
Step 9 Place PVP rubber mat over PVP lapping plate and line with 15, 5, 1, &.3 micron lapping film.
Step 10 Add 3 drops of water to each lapping film. Place connector into ST* polishing puck.
Note for Steps 11 thru 14: Be sure to blow off connector and puck after each lapping sequence to prevent contamination scratching of core.
Step 11 Do 10 figure 8's using light even pressure, with 15 micron lapping film.
Step 12 Do 14 figure 8's using 5 micron lapping film.
Step 13 Do 15 figure 8's using 1 micron lapping film.
Step 14 Do 15 figure 8's using .3 micron lapping film.
Step 15 Insert ferrule into angled portion of 100x Inspection Microscope. Verify that fiber is radiused and above glass surface.
Step 16 Then insert ferrule straight up into 100x Inspection Microscope and inspect fiber core. It should appear like the picture.
If necessary re-polish by repeating steps 12, 13, & 14.
*ST is a registered trademark of AT&T.
|
|
[Home] [Products] [Connectors] [Assembly Instructions] [ST* Instructions] [1200 Series] [1500 Series] [1700 Series] [SC Instructions] [FC Instructions]
2008
Pine Valley Precision, Inc.
|